Skip to content
Home
Services
Gap Analysis Audits
WHS Consultations
WHS Training
Safety Management Systems
Adelaide Hills Business Solutions
Articles
About Us
Contact
Home
Services
Gap Analysis Audits
WHS Consultations
WHS Training
Safety Management Systems
Adelaide Hills Business Solutions
Articles
About Us
Contact
08 7190 7910
08 7190 7910
Home
Services
Gap Analysis Audits
WHS Consultations
WHS Training
Safety Management Systems
Adelaide Hills Business Solutions
Articles
About Us
Contact
Site Safety Audit
Site Name
Auditor
Audit Date
Send Audit To (email address)
Is the Site Safety Plan (PL-002) available and accessible?
Documentation & Governance — Plans current on site · Priority: M · Applies:
Status:
Yes
No
N/A
Attach Photo(s)
Is the Site Emergency Plan (PL-003) displayed and site-specific?
Documentation & Governance — Emergency plan · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Is the Project Risk Register current and reviewed after changes/incidents?
Documentation & Governance — Risk Register · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are required permits issued & controlled (Electrical/Hot Works/Confined Space/Excavation/Crane)?
Documentation & Governance — Permits · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are safety noticeboards/signage displayed and current?
Documentation & Governance — Signage · Priority: M · Applies:
Status:
Yes
No
N/A
Attach Photo(s)
Have all workers completed site-specific induction and SWMS sign-on?
Induction & Consultation — Site induction · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are visitor sign-in and safety rules enforced?
Induction & Consultation — Visitor induction · Priority: M · Applies:
Status:
Yes
No
N/A
Attach Photo(s)
Is consultation occurring and recorded (toolbox, HSR/committee)?
Induction & Consultation — Consultation · Priority: M · Applies:
Status:
Yes
No
N/A
Attach Photo(s)
Are toolbox talks held (weekly) and actions closed out?
Induction & Consultation — Toolbox · Priority: M · Applies:
Status:
Yes
No
N/A
Attach Photo(s)
Are changes re-inducted into SWMS before work resumes?
Induction & Consultation — Change management · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Do operators hold correct HRW licences (CT/DG/RB/WP/LF etc.)?
Competency & Licensing — HRW licences · Priority: H · Applies: Operators
Status:
Yes
No
N/A
Attach Photo(s)
Is VOC completed for non‑HRW plant (SL/BL<11m/Excavator etc.)?
Competency & Licensing — VOC · Priority: H · Applies: Plant Operators
Status:
Yes
No
N/A
Attach Photo(s)
Are training registers current (asbestos/silica/W@H/manual handling)?
Competency & Licensing — Training records · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are wardens and first aiders appointed and trained?
Competency & Licensing — Wardens/First aid · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Is plant registered and inducted on site (sticker)?
Plant & Equipment — Register · Priority: H · Applies: All Plant
Status:
Yes
No
N/A
Attach Photo(s)
Are daily pre‑starts/logbooks completed for cranes/EWPs/forklifts/excavators?
Plant & Equipment — Pre‑starts · Priority: H · Applies: Plant
Status:
Yes
No
N/A
Attach Photo(s)
Are slings/chains/shackles inspected and in-date?
Plant & Equipment — Lifting gear · Priority: H · Applies: Rigging/Cranes
Status:
Yes
No
N/A
Attach Photo(s)
Are RCD tests monthly and tools tested & tagged?
Plant & Equipment — Electrical · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are spill kits available near plant refuelling/parking?
Plant & Equipment — Spill kits · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Is traffic management implemented (spotters/exclusion zones/wayfinding)?
Plant & Equipment — Traffic · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Are edges protected or WAH systems used/inspected?
High-Risk Construction Work — Falls >3m · Priority: H · Applies: All WAH
Status:
Yes
No
N/A
Attach Photo(s)
Are ladders industrial-rated, inspected, and used correctly?
High-Risk Construction Work — Ladders · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Is the right EWP used with harness/anchor & a rescue plan?
High-Risk Construction Work — EWPs · Priority: H · Applies: EWP Users
Status:
Yes
No
N/A
Attach Photo(s)
Are lift plans reviewed, exclusion zones set, comms/taglines in use?
High-Risk Construction Work — Cranes · Priority: H · Applies: Cranes
Status:
Yes
No
N/A
Attach Photo(s)
Outriggers on mats; tray clear; traffic control in place?
High-Risk Construction Work — Truck-mounted crane · Priority: H · Applies: Deliveries
Status:
Yes
No
N/A
Attach Photo(s)
Services located; trench protection; spoil set‑back?
High-Risk Construction Work — Excavation/Trenching · Priority: H · Applies: Excavation
Status:
Yes
No
N/A
Attach Photo(s)
Permit issued; fire watch; cylinders secured; extinguishers?
High-Risk Construction Work — Hot Works · Priority: H · Applies: Hot Works
Status:
Yes
No
N/A
Attach Photo(s)
Wet methods/HEPA/RPE used; HCS in place?
High-Risk Construction Work — Silica · Priority: H · Applies: Cutting/Grinding
Status:
Yes
No
N/A
Attach Photo(s)
Permit; gas test; rescue plan; trained entrants/spotters?
High-Risk Construction Work — Confined spaces · Priority: H · Applies: Confined spaces
Status:
Yes
No
N/A
Attach Photo(s)
LOTO applied; test for dead before work?
High-Risk Construction Work — Electrical LOTO · Priority: H · Applies: Electrical
Status:
Yes
No
N/A
Attach Photo(s)
Isolate/depressurise; overhead WAH controls in place?
High-Risk Construction Work — Fire systems · Priority: M · Applies: Fire Trades
Status:
Yes
No
N/A
Attach Photo(s)
Lifting aids/manual handling; WAH controls for overhead?
High-Risk Construction Work — Mechanical services · Priority: M · Applies: Mechanical
Status:
Yes
No
N/A
Attach Photo(s)
Engineered design; bracing; drop-zone control; stripping?
High-Risk Construction Work — Formwork/Suspended · Priority: H · Applies: Formwork
Status:
Yes
No
N/A
Attach Photo(s)
Within SWL; low speed; horn; pedestrian separation; LF license?
High-Risk Construction Work — Forklifts · Priority: H · Applies: Forklift Ops
Status:
Yes
No
N/A
Attach Photo(s)
Evacuation diagrams posted all levels/amenities?
Emergency Preparedness — Diagrams · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Emergency contacts posted/current?
Emergency Preparedness — Contacts · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Wardens/first aiders trained and listed?
Emergency Preparedness — Training · Priority: H · Applies: ERT
Status:
Yes
No
N/A
Attach Photo(s)
Extinguishers/blankets appropriate, accessible, in-date?
Emergency Preparedness — Equipment · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Kits stocked & AED maintained?
Emergency Preparedness — First aid · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Drill conducted and recorded (initial + 6‑monthly)?
Emergency Preparedness — Drills · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Rescue plans for EWP/tower crane/fall arrest/trench?
Emergency Preparedness — Rescue plans · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Air horns/comms tested?
Emergency Preparedness — Comms · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Egress routes clear and lighting adequate?
Emergency Preparedness — Egress · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Critical incident workflow known; roles allocated?
Emergency Preparedness — Critical incident · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Waste segregated; housekeeping maintained?
Environment & Housekeeping — Waste · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Spill kits present and complete?
Environment & Housekeeping — Spills · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Dust suppression and noise controls in place?
Environment & Housekeeping — Dust & noise · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Run‑off/washout controlled to protect drains?
Environment & Housekeeping — Stormwater · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Fencing/hoardings/signage/traffic controls at interfaces?
Environment & Housekeeping — Public protection · Priority: H · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
D&A and fit‑for‑duty controls applied?
Worker Wellbeing — Fitness for work · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Sun protection, shade, hydration breaks?
Worker Wellbeing — UV/heat · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Breaks and shift lengths managed?
Worker Wellbeing — Fatigue · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Amenities adequate, clean, stocked?
Worker Wellbeing — Amenities · Priority: L · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Wellbeing resources/contacts displayed?
Worker Wellbeing — Mental health · Priority: M · Applies: All
Status:
Yes
No
N/A
Attach Photo(s)
Send